01Time to power
Transformers ordered three years out. Interconnection queues. The sold-out gas turbine nobody can get. This show over-covers the boring constraints that decide which announced gigawatt ever runs.
02Two job numbers, every time
Construction jobs and permanent jobs are different numbers, and the press release usually gives you one. When a project promises to transform a county, the show asks what's actually in the agreement: rate protection, a cap on potable water, clawbacks if the jobs never arrive.
03The Hype Check
Every main story ends with a substance score, one to ten, said out loud. “Real site, real steel — but that gigawatt figure is doing a lot of unearned work.” You never have to guess where the show landed.